Scandium Canada Completes Record 10,018-Metre Drilling Campaign at Crater Lake, Overdelivering on Every Objective Set for 2026

1 Min Read

HIGHLIGHTS49 holes and 10,018 metres drilled, two and a half times the 4,000 metres initially planned for 2026;The Crater Lake TG deposit’s prospective footprint is now nearly 1.2 kilometres long, up from 700 metres in the 2025 resource estimate (link): at least 335 metres added to the north and 150 metres to the south;New parallel zone identified about 140 metres east of the TG deposit, at least 500 metres long and within the limits of the 2025 Pit Shell Design;15-tonne bulk sample collected…

Source: https://www.newsfilecorp.com/release/320144/Scandium-Canada-Completes-Record-10018Metre-Drilling-Campaign-at-Crater-Lake-Overdelivering-on-Every-Objective-Set-for-2026

TAGGED:
Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *