HIGHLIGHTS: The changes from the previous Preliminary Economic Assessment issued in December 2025 (“Previous PEA”) include:an upgrade in the tungsten mineral resource from inferred to measured and indicated (“M & I”) mineral resources, updated capital and operating costs, and a change in the tungsten recovery methodology from gravity to flotation concentration. 350% increase in annual tungsten production from the Previous PEA. The use of flotation instead of gravity as the recovery method,…
Moon River Moly Announces Robust Updated Preliminary Economic Assessment of Davidson Molybdenum-Copper-Tungsten Critical Minerals Project Demonstrating Improved Economics
Leave a Comment

