Karus Hits 14.6 Metres of 4.8g/t Gold in First Two of 11 Holes Testing High-Grade Structural Controls at FG Gold Project

1 Min Read

Vancouver, British Columbia–(Newsfile Corp. – October 19, 2026) – Karus Mining Inc. (CSE: KARU) (“Karus” or the “Company”) is pleased to announce initial drill assay results from the 2026 diamond drilling program at the FG Gold Project (“FG” or the “Project”) part of Karus’ wider South Cariboo Gold District (Figure 1).Karus Mining’s 2026 exploration program is focused on expanding high-grade mineralization at FG Gold, which hosts over 3 km of known mineralized strike and is part of a 25 km long…

Source: https://www.newsfilecorp.com/release/319656/Karus-Hits-14.6-Metres-of-4.8gt-Gold-in-First-Two-of-11-Holes-Testing-HighGrade-Structural-Controls-at-FG-Gold-Project

Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *