Sirios Completes Phase 1 of Expansion Drilling at Cheechoo and Intersects 39.94 g/t Gold over 6.5 m and 9.07 g/t Au over 12.5 m

1 Min Read

Montreal, Quebec–(Newsfile Corp. – September 29, 2026) – Sirios Resources Inc. (TSXV: SOI) (OTCQB: SIREF) (FSE: 377A) (“Sirios” or the “Company”) announces assay results from 15 holes totalling 6,850 m from Phase 1 drilling at its Cheechoo gold project, located in the Eeyou Istchee James Bay region of Quebec.Highlights:High-grade intervals:39.94 g/t Au over 6.5 m, including 129.00 g/t Au over 2.0 m (CH26-337)9.07 g/t Au over 12.5 m, including 103.11 g/t Au over 1.0 m (CH26-345)25.21 g/t Au over…

Source: https://www.newsfilecorp.com/release/316485/Sirios-Completes-Phase-1-of-Expansion-Drilling-at-Cheechoo-and-Intersects-39.94-gt-Gold-over-6.5-m-and-9.07-gt-Au-over-12.5-m

Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *